SSLNYNJ2279

MTA LIRR Side Snow Melter

JOB NAME:  MTA LIRR Side Snow Melter Location: New York Customer: MTA Completion: August 2021 THE PROJECT: Metro North Long Island Railroad was looking to install (2) switchboards & (2) substation transformers. The requirements for this project were unique starting from various components required, all equipment to be 25 HERTZ while the standard frequency is

MTA LIRR Side Snow Melter Read More »

Harrah AC

JOB NAME: Harrah AC Location: NJ Customer: Calvi Completion: April 2021 THE PROJECT: Calvi was the contractor on this transformer replacement for this hotel. After reviewing the conditions, the existing transformer dimensions, and pictures we decided that the manufacturer PEMCO would be the best fit for this project. PEMCO went to Harrah’s for a field

Harrah AC Read More »

ZT Systems

JOB NAME: ZT Systems Location: NJ Customer: AMEC Electric Completion: October 2022 THE PROJECT: AMEC Electric was the contractor on this project. This was a new warehouse and required a 35KV PSE&G switchgear line up & a 3500KVA pad mount transformer. We worked closely with the engineer on this project, Stoneridge Engineering. We facilitated this

ZT Systems Read More »

Legoland

JOB NAME: Legoland Location: NY Customer: Westfair Completion: March 2020 THE PROJECT: We partnered with Westfair on this project that required a large amount of pad mount transformers, pad mount switches, and a 15KV O&R metering switchgear line up. This was an amusement park that was proposed to open by July 2021. The project’s requirements

Legoland Read More »

Kean University

JOB NAME: Kean University Location: Union, NJ Customer: TSUG Electric Completion Date: Ongoing THE PROJECT: On this project, TSUG electric was awarded the job. During the bid phase, SSLNYNJ assisted Concord engineers on an alternate design as the building’s footprint was not going to be able to fit the equipment nor have the equipment on

Kean University Read More »

College of Staten Island

JOB NAME: College of Staten Island Location: Staten Island, New York Customer: Verde Electric Completion Date: Still on-going THE PROJECT: We partnered with Verde Electric on this 35KV large substation transformer replacement. In reviewing the drawings & specifications we worked on finding the most suitable transformer manufacturer for this specific replacement. We supplied a 10/13MVA

College of Staten Island Read More »

RFJK Bridge

JOB NAME: RFJK Bridge Customer Kiewit Construction Location: New York, New York Completion Date: 12/31/2019 THE PROJECT: Kiewit Construction contracted us to deliver a Duplex feed substation at an MTA facility for the purpose of supplying power. The critical aspect of this project was the sizing of the equipment. There was extremely limited space, and

RFJK Bridge Read More »

Trinitas Hospital on New Year’s Eve

JOB NAME: Trinitas Hospital on New Year’s Eve Customer: EII Electrical Contractors Location: Elizabeth, NJ Completion Date: 3/20 THE PROJECT: A tragic transformer failure occurred at Trinitas Hospital on New Year’s Eve due to a leaking conduit. The original inquiry requested a new core and coil assembly to be delivered onsite. Time was a critical

Trinitas Hospital on New Year’s Eve Read More »

Path Substation

JOB NAME: Path Substation Customer: PATH Port Authority of NY&NJ Location: Jersey City, NJ Completion Date: 12/31/2022 THE PROJECT: The largest and most complex project SSLNYNJ has ever been involved in. We partnered with Mass Electric to deliver a Traction Power Substation to Path Facilities. Our team integrated various manufacturers to deliver a substation with

Path Substation Read More »

Scroll to Top